Menvier Security TS900+ Especificaciones Pagina 14

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 68
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 13
When the link is set to the enabled position the
sounder is only enabled when the remote
keypad programmable output is active. For
example, to make the keypad ward
respective for ward A, program the output on
the remote keypad to "Sounder Control A"
(type 064) and set the "Ward Sounder Control"
link to the enabled position.
7. Finally clip the remote keypad cover onto the
base being careful not to trap any cables or to
obstruct the tamper switch.
Engineer’s Keypad
Normally all system programming will be carried
out from one of the installed remote keypads,
however sometimes it may be more convenient to
program the system at the control panel. This can
be achieved by using an “Engineers Keypad”
which is temporarily plugged on to the control
panel (JP2). To convert a standard remote keypad
to an “Engineers Keypad” an Engineer’s interface
lead is required which can be obtained from your
supplier (P/No. NETEKI).
TS900 Node Installation (TS900 Only)
The TS900 NODE allows the facility to add an extra
eight programmable detection circuits and two
programmable outputs. The Nodes are
connected on the “Node Network” and up to five
may be connected to the TS900 system.
Always ensure that all power (mains
and battery) is removed before
making any connections to the Node.
1. Separate the cover and base by using a
screwdriver to push 2 of the clips (left or right)
inward from the base indents, then lift the
cover clear.
2. If the Node is being fitted inside the control
panel you may remove the Node PCB from its
base and secure it to base of the control panel
using self adhesive feet. If required, the tamper
switch may also be disabled by fitting the
jumper link across JP2, see Figure 11.
3. If the Node is being fitted outside the control
panel, hold the base in position and mark the
four securing holes. Drill and plug the wall as
required, then pass all cables into the base via
the cable entry points as appropriate. Secure
the base to the wall using the appropriate
fixing screws.
4. Connect “Node Network” cables and
detection circuit cables to the appropriate
terminals, see Figure 11.
5. Set the I/D selector jumper link to the required
position:
Node I/D
12345
C
I
R
C
U
I
T
S
A 17 25 33 41 49
B 18 26 34 42 50
C 19 27 35 43 51
D 20 28 36 44 52
E 21 29 37 45 53
F 22 30 38 46 54
G 23 31 39 47 55
H 24 32 40 48 56
OPs
+A 13579
-B 24680
l
No two NODES should have the same I/D.
l
The NODE I/D selector DOES NOT have to
be set sequentially but it is advisable so as
to aid fault finding and programming.
6. Finally clip the Node cover onto the base
being careful not to trap any cables or to
obstruct the tamper switch.
10
System Installation TS790 & TS900 Installation Manual
Control Panel
To TS900
Remote
Keypad
A (Red)
A
AUX
12V
0V
ENGINEERS REMOTE
JP2
C (Yellow)
B
B(Black)
C
D(White)
D
E(Blue)
E
7 Way 0.1" Molex
connector
Figure 10. Engineer's Keypad Connections
Vista de pagina 13
1 2 ... 9 10 11 12 13 14 15 16 17 18 19 ... 67 68

Comentarios a estos manuales

Sin comentarios